Research for TRAN Committee - Status Report on the Deployment of SESAR
Studiu
13-05-2016
This report captures the status of deployment of SESAR through the Pilot Common Project (PCP) in terms of state of play, costs and timeliness. It is concluded that the PCP implementation is on time and underpinned by a credible management structure. The expenditure to date through the Connecting Europe Facility (CEF) mechanism is EUR 325.4 million, out of EUR 3 billion planned for 2014-2020. However, as the PCP implementation is at an early stage, the benefits are still to be quantified.
Studiu
Autor extern
Washington Yotto Ochieng (FREng) and Milena Studic
Despre acest document
Tipul publicației
Domeniul tematic
Cuvânt-cheie
- AELS
- AFACERI ŞI CONCURENŢĂ
- aviație civilă
- categorii de societăţi comerciale
- cerul unic european
- construcţie europeană
- control trafic aerian
- cooperare tehnică
- DREPT
- drept internaţional
- ECONOMIE
- Eurocontrol
- evaluarea proiectului
- management
- ONU
- organizaţii europene
- ORGANIZAŢII INTERNAŢIONALE
- Organizația Aviației Civile Internaționale
- parteneriat publico-privat
- piață unică
- plan de dezvoltare
- politica transporturilor
- politici de cooperare
- POLITICĂ
- politică economică
- putere executivă şi administraţie publică
- RELAŢII INTERNAŢIONALE
- siguranță aeriană
- spațiu aerian
- TRANSPORT
- transport aerian şi spaţial
- UNIUNEA EUROPEANĂ
- întreprindere comună